Advertisements

Asia’s largest thermal power carbon dioxide capture, utilization and storage project put into operation today

by admin

On June 2, Asia’s largest thermal power carbon dioxide capture, utilization and storage project – National Energy Group’s Jiangsu Taizhou Power Plant Project was officially put into operation after several days of full-load operation. It can capture and absorb 500,000 tons of carbon dioxide per year.

The project is completely independently designed, manufactured, and installed by China. It is currently the CCUS project with the highest technical content in the thermal power industry in Asia. The carbon dioxide capture rate is greater than 90%, and the dry basis carbon dioxide purity of the output is greater than 99%. All indicators are at the leading level in the industry .

Advertisements

You May Also Like

Futurestradingltd is a comprehensive futures portal. The main columns include futures market, futures exchanges, futures varieties, futures basic knowledge and other columns.

[Contact us: [email protected]]

© 2023 Copyright  futurestradingltd.com – Futures Market, Investment, Trading & News